Mailing Lists: Apple Mailing Lists

Image of Mac OS face in stamp
 
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Updating to the latest production release of J2SE 5.0 Release 4



I know there are no guarantees with the DPs but what course of action should
I follow to maximize my chances that I will end up with the standard
configuration of J2SE 5.0 Release 4 without doing a clean reinstall of the
OS?

I am currently running a DP version of J2SE 5.0 Release 4. I don't know
which DP version it is but I do know it is not the last DP release version
before J2SE 5.0 Release 4 was released to the public.

java -version returns:

java version "1.5.0_06"
Java(TM) 2 Runtime Environment, Standard Edition (build 1.5.0_06-110)
Java HotSpot(TM) Client VM (build 1.5.0_06-61, mixed mode, sharing)


Do I need to sequentially update through the DPs before installing the final
release? If so, where can I obtain them? Thanks.

 _______________________________________________
Do not post admin requests to the list. They will be ignored.
Java-dev mailing list      (email@hidden)
Help/Unsubscribe/Update your Subscription:
http://lists.apple.com/mailman/options/java-dev/email@hidden

This email sent to email@hidden



Visit the Apple Store online or at retail locations.
1-800-MY-APPLE

Contact Apple | Terms of Use | Privacy Policy

Copyright © 2007 Apple Inc. All rights reserved.