Interlaced/Progressive
Interlaced/Progressive
- Subject: Interlaced/Progressive
- From: Peter Litwinowicz <email@hidden>
- Date: Tue, 19 Jul 2011 17:45:16 -0700
- Thread-topic: Interlaced/Progressive
In Motion 5 if I put an interlaced clip inside a group in a progressive project, and my test effect which checks out images, I get that the in and out field orders of the inputs and outputs are interlaced.
How do I properly set up a group to be progressive while the clip inside it is interlaced and have these properties reported to me properly? (this is something we worked so hard on for FCP 6 and 7 and we really need this functionality).
Is Motion 5 always going to report to me that the output is interlaced if the input is interlaced? And report to me the output is progressive if the input is progressive? I suppose we can ask the user what the output field-ness is if this is the case. Argh, more tech support on our end.
And if have lower field first footage and I request input frame 7.5 then I get reported to me that the frame returned to me is made from the lower field, when indeed it is made from the upper field (the second field in time). Once again, I suppose I can get the field order for the clip, decide whether we are being rendered at time N or N+0.5 and do the appropriate calculation myself. This would be great to have fixed.
Pete
|
_______________________________________________
Do not post admin requests to the list. They will be ignored.
Pro-apps-dev mailing list (email@hidden)
Help/Unsubscribe/Update your Subscription:
This email sent to email@hidden